Here are the City of Gilroy Engineering Projects and their status

New Gilroy Library
Planning and Design Phase
Acquisition and Easements Phase
Bid and Construction Phase
Master Planning in Progress
Completed Projects and Master Plans

New Gilroy Library

In November, 2008, voters approved bond funding in the amount of $37 million to complete a design for the new library, move the existing operation to temporary facilities, demolish the existing building, acquire property for additional parking improvements, and construct the new library. Linked below is important information relating to this project.

View live pictures of the library demolition here
******UserID = public
***Password = libcam

Planning and Design Phase

    FACILITIES
    • Existing Fire Station Livability Improvements
    • ADA Imp and San Ysidro Park Community Bldg
    • City Hall Annex Improvements
    • City Hall Improvements
    • Gym and Aquatics Facility with New High School
    ROADS
    • Tenth Street Bridge Design
    • Luchessa Bridge Design
    • Signal at Wren and Welburn
    • Signal at Mantelli and Hirasaki
    • Signal at Mantelli and Kern
    • Signal at Mantelli and Wren
    • Signal at Mantelli and Church
    • Signal at Kern and Welburn
    • Signal at Monterey and Entrance to Gilroy Sports Park
    • Lewis and Railroad HIP Grant Improvements
    • Downtown Side Street Grant (Sixth Street from Eigleberry to Railroad)
    • Downtown Side Street Design
    • Chestnut Pedestrian Bridge
    • Signal Modifications - Tenth and Church
    • Lewis, Fourth and Martin Street Design
    • Lewis Street between Monterey and Railroad Street Design
    • Pavement Rehabilitation Forest, between Lewis and Sixth
    • Tenth Street Interchange Gap Closure
    • Sidewalk Gap Closure and ADA Ramp Improvements
    PARK
    • Lions Creek/Uvas Ranch Site Trail Extension Grant
    • Demo Barn at Ranch Site
    • Christmas Hill Park Improvements
    • Las Animas Interim Pond Improvements
    SCRWA
    • SCRWA River Discharge (South Pipeline Project)
    • SCRWA 12.75 MGD Plant Capacity Expansion
    • SCRWA Utility Water Pipeline
    • SCRWA UV Disinfection System
    • SCRWA Pond Valves and Spillways
    • SCRWA Clarifier Dewatering Wells
    • SCRWA Septage Receiving Station
    WATER
    • Silacci Production Well 9-1 Design
    • Well 8 Generator Replacement
    • 16" Water Main Replacement, First Street between Hanna and Wren
    SEWER
    • Sewer System Assessment Program
    • 33" / 42" Morgan Hill / Gilroy Trunk Main Improvements

Acquisition and Easements Phase

    ROADS
    • Camino Arroyo North Widening
    WATER
    • Silacci Well 9-1 Site Acquisition

Bid and Construction Phase

    ROADS
    • Camino Arroyo Bridge
    • Camino Arroyo Bridge Sixth Street Traffic Calming
    SCRWA>
    • SCRWA Earth Stability
    • Forest Street Well 3-2
    • Paint & Repair Reservoirs (Reservoirs A & B Internal Coating)

Master Planning in Progress

    • Gilroy Center for the Arts Master Plan
    • Bicycle Track Needs Analysis, Site Selection and Conceptual Plans
    • Christmas Hill Park Ranch Site Update and Hillside Master Plan
    • Downtown Monterey Streetscape / Side Streets Conceptual Plan
    • Downtown Paseo Conceptual Design
    • Traffic Monitoring Program
    • Right of Way Standards for Pedestrians
    • Downtown Utility Underground District
    • Parking Management Plan
    • Protected Intercetion Program
    • Storm Water Management Program NPDES
    • Sewer System Management Program SSMP
    • Sidewalk Task Force
    • Library Expansion Task Force


    • MASTER PLAN UPDATES:
      • Las Animas Veterans Park Master Plan
      • Forest Street Park Master Plan
      • El Roble Park Master Plan
      • BMX Dirt Bike Facility / Sports Park Master Plan
      • Parks Master Plan
      • Police Master Plan
      • Fire Master Plan
      • Public Facilities Master Plan
      • Library Master Plan
      • Circulation Element Master Plan
      • Storm System Master Plan
      • Sewer System Master Plan
      • Water System Master Plan

      STUDIES:
      • Sports Park to Gavilan College Class I Trail Study
      • Financial Study for CIB Funding Gap
      • Tenth Street Corridor Study
      • Communication Network Design Study
      • Computerized Traffic Signal Study
      • Levee Recertification Study
      • Impact Fee Nexus Study

Completed Projects and Master Plans